Location: Greenfield, IN
Construction Cost: $30,000,000
Services: Construction Administration
On a 7-mile stretch of I-70 between mile markers 108 and 117, this project included the restructuring of six bridges, performing field tests for asphalt, concrete, and materials testing for roads and bridges. While under construction, traffic was reduced to on lane, traffic was redirected over designed crossovers, and there was new bridge decking. This was a fast track project, running 24 hours a day and completed in 3 months.
Construction Cost: $30,000,000
Services: Construction Administration
On a 7-mile stretch of I-70 between mile markers 108 and 117, this project included the restructuring of six bridges, performing field tests for asphalt, concrete, and materials testing for roads and bridges. While under construction, traffic was reduced to on lane, traffic was redirected over designed crossovers, and there was new bridge decking. This was a fast track project, running 24 hours a day and completed in 3 months.