Location: Burns Harbor Port
Construction Cost: $1,000,000
Services: Transportation Engineering
The Road design consisted of 14.5’ lanes and 2’ aggregate shoulders. There was 1 public road approach and 4 drives. Truck Turn analysis was performed for WB-67D trucks. A heavy haul road thickness was the desired pavement design. The design was completed in 3 months. Maintenance of Traffic was performed along with signage and pavement markings.
Construction Cost: $1,000,000
Services: Transportation Engineering
The Road design consisted of 14.5’ lanes and 2’ aggregate shoulders. There was 1 public road approach and 4 drives. Truck Turn analysis was performed for WB-67D trucks. A heavy haul road thickness was the desired pavement design. The design was completed in 3 months. Maintenance of Traffic was performed along with signage and pavement markings.