Location: Carmel, IN
Construction Cost: $1,700,000
Services: Construction Administration
The project included 0.5 miles of 8’ asphalt multi-use pathway between Rangeline Road and Keystone Ave. The project installed a new box truss bridge, along with reconstruction of drives, storm sewer and curb and gutter. Maintenance of traffic was important along with getting the project open before school began. Concrete testing was provided on the project.
Construction Cost: $1,700,000
Services: Construction Administration
The project included 0.5 miles of 8’ asphalt multi-use pathway between Rangeline Road and Keystone Ave. The project installed a new box truss bridge, along with reconstruction of drives, storm sewer and curb and gutter. Maintenance of traffic was important along with getting the project open before school began. Concrete testing was provided on the project.